Himalaya Diary -Leading News Portal from Nepal, Kathmandu, Asia
  • Home
  • Business
  • News
    • India
    • Nepal
    • South Asia
    • World
  • Education
  • Literature
  • Sports
  • Literary Festival & Event
  • Science & Technology
  • Home
  • Business
  • News
    • India
    • Nepal
    • South Asia
    • World
  • Education
  • Literature
  • Sports
  • Literary Festival & Event
  • Science & Technology
No Result
View All Result
No Result
View All Result
Home Global News

Reactor vessel installed at Kudankulam NPP Unit 3

himalaya Diary News Service by himalaya Diary News Service
May 1, 2022
in Global News, India, World
0
Reactor vessel installed at Kudankulam NPP Unit 3
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Moscow – The reactor vessel has been installed in design position at Kudankulam NPP Unit 3 (Republic of India, general designer and general contractor is Rosatom State Corporation Engineering Division).

The assembly of the reactor vessel is a milestone, which launches further activities for the assembly of the reactor plant equipment allowing to speed up the construction of Unit 3 within the framework of the second stage of Kudankulam NPP.

The Indian customer, for the first time during the assembly of VVER-type units, assembled the reactor vessel by the “Open Top” method. This technology makes it possible to significantly reduce the time period of the project implementation due to optimization and reduction of the duration and number of assembly operations.

Certification of caterpillar crane LIEBHERR LR-11350 with the capacity of 1130 tons was successfully performed within the framework of preparation for the installation of the reactor vessel. The certification was necessary for ensuring the safety of operations as the total weight of the reactor vessel is 327 tons. This procedure is the final stage for receipt of the permit of the official bodies of India regulating the performance of assembly of the NPP main equipment.

Earlier, ASE JSC (part of Rosatom State Corporation Engineering Division) had shipped the reactor to the construction site in accordance with its obligations.

 

Advertisement Banner
Previous Post

ZIM A won the Toss and elected field first against Nepal

Next Post

Zimbabwe A beat Nepal by six wickets in the 1st T20I

himalaya Diary News Service

himalaya Diary News Service

Next Post
ZIM A won the Toss and elected field first against Nepal

Zimbabwe A beat Nepal by six wickets in the 1st T20I

Recommended

Investment Board Nepal hosted a validation workshop on the IBNPB Guideline seeking inputs from various stakeholders

Investment Board Nepal hosted a validation workshop on the IBNPB Guideline seeking inputs from various stakeholders

4 years ago
Nepal hotels to ban single-use plastic by 2024

Sixty-five high-end American tourists arrive in Kathmandu

3 months ago

Don't Miss

Durga Prasai arrested over spreading misleading election information

Durga Prasai arrested

March 1, 2026
Nepal: 11,000 quintals of paddy purchased from farmers in Mahottari and Dhanusha in the past three months

Nepal: 11,000 quintals of paddy purchased from farmers in Mahottari and Dhanusha in the past three months

March 1, 2026
Nepal’s insurance sector collected more than Rs 1.2 trillion in premiums during the first six months of the fiscal year

Nepal Life insurers record 13 percent premium growth

March 1, 2026
Investment Board Nepal to operationalize one-stop service center

Nepal Investment Board promotes digital economy collaboration

March 1, 2026
Himalaya Diary -Leading News Portal from Nepal, Kathmandu, Asia

Copyright © 2025 Himalaya Diary.

Navigate Site

  • About Us
  • Editor In Chief
  • Contact

Follow Us

No Result
View All Result
  • Home
  • Business
  • News
    • India
    • Nepal
    • South Asia
    • World
  • Education
  • Literature
  • Sports
  • Literary Festival & Event
  • Science & Technology

Copyright © 2025 Himalaya Diary.