Himalaya Diary -Leading News Portal from Nepal, Kathmandu, Asia
  • Home
  • Business
  • News
    • India
    • Nepal
    • South Asia
    • World
  • Education
  • Literature
  • Sports
  • Literary Festival & Event
  • Science & Technology
  • Home
  • Business
  • News
    • India
    • Nepal
    • South Asia
    • World
  • Education
  • Literature
  • Sports
  • Literary Festival & Event
  • Science & Technology
No Result
View All Result
No Result
View All Result
Home Global News

Reactor vessel installed at Kudankulam NPP Unit 3

himalaya Diary News Service by himalaya Diary News Service
May 1, 2022
in Global News, India, World
0
Reactor vessel installed at Kudankulam NPP Unit 3
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Moscow – The reactor vessel has been installed in design position at Kudankulam NPP Unit 3 (Republic of India, general designer and general contractor is Rosatom State Corporation Engineering Division).

The assembly of the reactor vessel is a milestone, which launches further activities for the assembly of the reactor plant equipment allowing to speed up the construction of Unit 3 within the framework of the second stage of Kudankulam NPP.

The Indian customer, for the first time during the assembly of VVER-type units, assembled the reactor vessel by the “Open Top” method. This technology makes it possible to significantly reduce the time period of the project implementation due to optimization and reduction of the duration and number of assembly operations.

Certification of caterpillar crane LIEBHERR LR-11350 with the capacity of 1130 tons was successfully performed within the framework of preparation for the installation of the reactor vessel. The certification was necessary for ensuring the safety of operations as the total weight of the reactor vessel is 327 tons. This procedure is the final stage for receipt of the permit of the official bodies of India regulating the performance of assembly of the NPP main equipment.

Earlier, ASE JSC (part of Rosatom State Corporation Engineering Division) had shipped the reactor to the construction site in accordance with its obligations.

 

Advertisement Banner
Previous Post

ZIM A won the Toss and elected field first against Nepal

Next Post

Zimbabwe A beat Nepal by six wickets in the 1st T20I

himalaya Diary News Service

himalaya Diary News Service

Next Post
ZIM A won the Toss and elected field first against Nepal

Zimbabwe A beat Nepal by six wickets in the 1st T20I

Recommended

Royal Enfield Himalayan Odyssey returns after 2 years; 18th Himalayan Odyssey flagged-off from India Gate, Delhi

Royal Enfield Himalayan Odyssey returns after 2 years; 18th Himalayan Odyssey flagged-off from India Gate, Delhi

4 years ago
जगदीश घिमिरेको कथा ‘साबिती’ माथि नाटक मञ्चन हुँदै

जगदीश घिमिरेको कथा ‘साबिती’ माथि नाटक मञ्चन हुँदै

4 years ago

Don't Miss

Dr. Karma Wangchu Sherpa honored

Dr. Karma Wangchu Sherpa honored

February 8, 2026

Italy will not join Trump’s ‘Board of Peace’

February 8, 2026
काठमाडौँ उपत्यकाको वायु प्रदूषण अस्वस्थ तहमा

काठमाडौँ उपत्यकाको वायु प्रदूषण अस्वस्थ तहमा

February 8, 2026
अमेरिकाको ग्रीनल्यान्डलाई अधिग्रहण गर्ने धम्कीबीच क्यानडा र फ्रान्सले खोले वाणिज्य दूतावास

अमेरिकाको ग्रीनल्यान्डलाई अधिग्रहण गर्ने धम्कीबीच क्यानडा र फ्रान्सले खोले वाणिज्य दूतावास

February 8, 2026
Himalaya Diary -Leading News Portal from Nepal, Kathmandu, Asia

Copyright © 2025 Himalaya Diary.

Navigate Site

  • About Us
  • Editor In Chief
  • Contact

Follow Us

No Result
View All Result
  • Home
  • Business
  • News
    • India
    • Nepal
    • South Asia
    • World
  • Education
  • Literature
  • Sports
  • Literary Festival & Event
  • Science & Technology

Copyright © 2025 Himalaya Diary.