Nepal Telecom has restored mobile services at seven additional locations in flood-affected areas, bringing most mobile BTS sites in the affected regions back into operation. The sites restored on Sunday include the Rasuwa Border site located along the Nepal-China border, as well as Upper Sengen, Chhapthoke, Jipjipe and Gatlang sites in Rasuwa, according to Nepal Telecom. Similarly, the Charghare and Charghare Mulabari BTS sites in Nuwakot have also resumed operations.






Discussion about this post